2.2: Specifications 2-9
2.3: Compliance 2-15
2.4: Accuracy 2-16
3: Mechanical Installation 3-1
3.1: Introduction 3-1
3.2: ANSI Installation Steps 3-4
3.3: DIN Installation Steps 3-5
3.4: Shark® 100T Transducer Installation 3-6
4: Electrical Installation 4-1
4.1: Considerations When Installing Meters 4-1
4.2: CT Leads Terminated to Meter 4-4
4.3: CT Leads Pass Through (No Meter Termination) 4-5
4.4: Quick Connect Crimp-on Terminations 4-6
4.5: Voltage and Power Supply Connections 4-7
4.6: Ground Connections 4-7
4.7: Voltage Fuses 4-7
4.8: Electrical Connection Diagrams 4-8
4.9: Extended Surge Protection for Substation Instrumentation 4-21
5: Communication Installation 5-1
5.1: Shark® 100/50 Meter Serial Based Communication 5-1
5.1.1: IrDA Port (Com 1) 5-2
5.1.2: RS485/KYZ Output Com 2 (485P Option) 5-3
5.1.2.1: Using the Unicom 2500 5-7