EasyManua.ls Logo

Sharp IQ-8920 - Date Calculation

Sharp IQ-8920
322 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Changing part of a calculation
1.
Move to the line you want to change using
[PREV]
.
2. Enter the new operator and value then press
(m).
3. Press
[m)
again to get the new answer.
Deleting a line
1.
Move to the line you want to delete using
[m)
.
2. Press
(DEL)
.
3. Press
[ENTER)
to get the new total.
Date
Using the
Calc
application, you can calculate the period
calculation
of time (in days) between two specific dates, and also
determine what the date will be a certain number of days
before or after a specific date.
Calculating the number of days between two dates
1. Touch
1-j
to call the date calculator.
The current date is the default starting date.
If you want the calculation to start from the current date,
skip step
2
below.
Starting date
2. Touch
1
CANCEL
1
to clear the starting date field and enter
the desired starting date. Prefix a single-digit month or
date with a 0.
*/
You can also modify a specific part of a date by touching
it, then entering the desired numbers.
3. Touch
ml.
177

Table of Contents

Related product manuals