EasyManua.ls Logo

Sharp XE-A40S

Sharp XE-A40S
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
XE-A40S
5 – 4
11. FLASH ROM TEST
11.1. Key operation
11.2. Test procedure
The test program checks that the checksum of the flash ROM
(BANK0F80000H ~ FFFFFH).
The lower two digits of the check sum should be 10H.
11.3. Check:
The completion print.
11.4. End of testing
The test will automatically be terminated and the printer prints as fol-
lows:
12. AD CONVERSION PORT TEST
12.1. Key operation
12.2. Test procedure
The test program displays the voltage of each AD conversion port.
13. USB COMMUNICATION TEST 1(ID/Address print)
13.1. Key operation
13.2. Detail of the test
USB revision, Vendor ID, Product ID, and the device address assigned
by the host are printed.
13.3. Display print
13.3.1 Display
13.3.2 Print
* Only the journal side. The receipt side is not printed.
13.4. Test completion
After completion of printing, the test is terminated automatically.
[3] KEY CODE TABLE
130 RCPT/PO
When the test ends normally: 130
ROM ******** (Model name)
******** (Version)
When the test ends abnormally: E ~ 130
ROM ******** (Model name)
******** (Version)
160 RCPT/PO
520 CH
ROMFLASH
PGM
OP display
130
TM
PGM
OP display
Display
160
=
VRF
PGM
OP display
160
=
VPTEST
PGM
OP display
160
=
End of testing
520
USB Rev. Ver. XXX
VENDOR ID 04DD (Device address)
PRODUCT ID 90B6 When the host is connected: 1
DEVICE ADDRESS X When the host is not connected: 0
OP display
520
USB T EST 1 PGM

Other manuals for Sharp XE-A40S

Related product manuals