Installation
GMS815P-PS-2G/-3G · Supplementary Operating Instructions · 8016234 V2.0 · © SICK AG 17
Subject to change without notice
3.3.3 Feeding sample gas
▸
Observe the basic information and safety information concerning feeding sample gas:
▸
The approval requirements have priority (→ p. 34, §6.5).
3.3.4 Feeding purge gas to an Analyzer module (option)
Only valid for versions with purge gas connections for an Analyzer module
▸
Feed the required purge gas via the “purge in” gas connection and discharge the purge
gas via the “purge out” gas connection as described in the Supplementary Operating
Instructions of the Analyzer module.
▸
Feed and discharge purge gas so that the purge gas pressure in the enclosure is not
above 15 mbar (approval condition).
▸
Use nitrogen (techn.) as inert gas.
Information Described in document
Function of sample gas connections “GMS800 Series” Operating Instructions
Specifications for sample gas feed Supplementary Operating Instructions for the
Analyzer modules fitted
● Gas connection positions → p. 32, §6.1
● Technical details for gas connections → p. 34, §6.5