5.3 Connecting PROFINET IO
ET 200M
76 Operating Instructions, 04/2022, EWA-4NEB7806006-09
Installing the PROFINET cable connector
Install the PROFINET connector according to the specifications in the "PROFINET installation
guideline (http://www.profibus.com/pall/meta/downloads/article/00328/)".
For more information, refer to the "PROFINET Cabling and Interconnection Technology
(http://www.profibus.com/pall/meta/downloads/article/00327/)" manual.
Pin assignment of the RJ45 connector
View of the RJ45 socket
Terminal
Assignment
1
RD (Receive Data +)
2
RD_N (Receive Data –)
3
TD (Transmit Data +)
4
Ground
5
Ground
6
TD_N (Transmit Data –)
7
Ground
8
Ground
Installing the cable holder
Install the supplied cable holder (see figure above).
1. Open the front door of the IM 153-4 PN interface module.
2. Insert the cable holder into the prepared cutout on the interface module.
3. Screw the cable holder firmly into place.