500-8067.9 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * Revision 03 111
Operation
De-earthing the transformer feeder
Ö Initial situation EARTHED.
Ö Push control gate downwards.
Ö Insert operating lever and turn 55° counter-clockwise.
Ö Remove operating lever (control gate returns to its initial position).
r The feeder is de-earthed.