Operation
110 Revision 03 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * 500-8067.9
Earthing the transformer feeder
Ö Initial situation OPEN.
Ö Push control gate downwards.
Ö Insert operating lever and turn 55° clockwise.
Ö Remove operating lever (control gate returns to its initial position).
r The feeder is earthed.