Operation
108 Revision 03 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * 500-8067.9
16.4 Operating the transformer feeder
Connecting the transformer feeder to the busbar
Ö Initial situation OPEN.
Ö Push control gate upwards.
Ö Insert operating lever and turn 70° clockwise.
Ö Remove operating lever (control gate returns to its initial position).