Test reports
6.3 Test report
System: _______________________ Location: _________________ Date: ___________________
Test room: _______________________ Test supervisor: _____________________________________
Participants: ____________________________________________________________________________
Purpose of test: ___________________________________________________________________________
____________________________________________________________________________
Test set-up:
Type and size of test fire: _______________________________________________________________
Sketch of test set-up with room conditions and test fire location: Overleaf
System data:
General: S-LINE detectors: C-LINE detectors:
Total room area: ______________ m
2
FDOOT241 FDOOT221
Monitoring area: ______________ m
2
FDO241 FDO221
Room height: ______________ m FDT241 FDT221
No. of detectors: ______________ FDF241 FDF221
FDL241
Ceiling construction: Detector setting:
Flat Parameter set no. __________
Gabled
Shed
Special (sketch overleaf)
Joists __________cm
Ventilation conditions:
Without exchange of air
With exchange of air ________ times/h
Test result:
Alarm (yes/no): ______________ Time of alarm: ________________________
(after start of acceptance test fire)
Assessment
of result: _____________________________________________________________________
Conclusions: ______________________________________________________________________
______________________________________________________________________
Comments: ______________________________________________________________________
______________________________________________________________________
Signature of test supervisor: _______________________________
22
Building Technologies 009977_b_en.doc
Fire Safety & Security Products 10.2007