7 Performing maintenance
Hematek
®
3000 System – Instruction Manual – Version 1.3 17
7
7 Performing maintenance
This chapter describes how to perform maintenance and replacement work.
7.1 Periodic maintenance
Periodic maintenance actions are listed in Table 7-1.
7.2 Installing the Hematek Stain Pak
You will need:
1 new Hematek Stain Pak
Interval Action See
After three Hematek Stain Paks have been used Replace pump tubing Chapter 7.3
After ten Hematek Stain Paks have been used Replace underplaten tubing Chapter 7.4
Table 7-1 Periodic maintenance list
WARNING
The Hematek Stain Pak contains methanol. Risk of very serious
irreversible effects through inhalation, in contact with skin, and if
swallowed
Death or serious injury can result.
Keep the containers of the Hematek Stain Pak tightly closed.
Wear appropriate personal protective equipment; that is, gloves,
protective clothing, safety glasses and mask.
Pay attention to the manufacturer's information regarding the gloves'
compatibility with the materials and liquids used.
Avoid contact with eyes and skin.
In case of contact with eyes or skin, immediately rinse the affected area
with plenty of water for at least 15 minutes.
In the event of an accident or if you feel unwell, seek medical advice
immediately and show the label if possible.
Refer to the Hematek Stain Pak labeling and to Material Safety Data
Sheets for more information on first aid measures. Material Safety Data
Sheets are available from Siemens.