EasyManua.ls Logo

Siemens NXAIR M - Page 124

Siemens NXAIR M
255 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the removable voltage transformers
124 NXAIR M 139-2021.9 / 07
Loosen the protection fuse-link by turning, and pull it out of the voltage transformer housing
with mounted contact cap.
Fig. 207: Pulling out the protection fuse-link
Detach the contact cap from the protection fuse-link.
Fig. 208: Detaching the contact cap
Mount the contact cap on the new protection fuse-link.
Push the new protection fuse-link into the housing.
Perform replacement with all other fuse-links.
The protection fuse-links have been replaced.
HINT
Final procedure
Next, insert the removable voltage transformers in the panel. After closing
the high-voltage door, the panel can be integrated into the course of
operation again.

Table of Contents

Related product manuals