English
Contents
Notes E-2
1. Description E-3
1.1 Application range E-3
1.2 External explosion protection E-3
1.2.1 Pre-purging phase E-3
1.2.2 Operating phase E-3
1.3 Internal explosion protection E-3
1.4 Further safety measures E-4
1.4.1 Analyzer versions EEx p with
"Compensation of losses resulting from leaks" E-4
1.4.2 Analyzer versions EEx p with "Continuous purging" E-4
2. Technical specifications E-5
2.1 Installation site E-5
2.2 Explosion protection E-5
2.3 Sample gas input conditions E-5
2.4 Pneumatic data of the protective gas E-6
2.5 EEx p safety device E-6
2.6 Differential pressure monitoring E-7
2.7 Accessories E-7
3. Assembly Guidelines E-8
3.1 Connection of sample gas and protective gas E-8
3.2 Assembly diagram for the versions EEx p with "Compensation of losses
resulting from leaks" E-9
3.3 Assembly diagram for the versions EEx p with "Continuous purging" E-10
3.4 Electric connections E-11
3.5 Inputs and outputs E-11
4. Commissioning E-12
4.1 Connection to the EEx p safety device E-12
4.2 Pressure correction E-12
4.3 Key switch E-12
5. Additional equipment E-13
6. Maintenance E-13
6.1 Leak testing of containment system (sample gas path) E-13
6.1.1 Recommended test setup for CALOMAT 6F and OXYMAT 6F E-13
6.1.2 Recommended test setup for ULTRAMAT 6F E-14
6.1.3 Carrying out the leak test E-14
6.2 EEx p safety device E-15
6.3 Analyzers and additional equipment E-15
6.4 Spare parts E-15
Appendix A-1