Commissioning
11
11.1 Overview
Introduction
This section includes information on the following topics:
Check before powering on for the first time
Commissioning procedure
Removing/inserting the SIMATIC Memory Cards
First power-on of the CPUs
CPU pairing
Assigning redundancy IDs
Downloading projects to the CPUs
Operating and system states
CPU memory resets
Backing up and restoring the configuration
Time synchronization
Identification and maintenance data
Commissioning requirements
NOTE
Performing tests
You must ensure the safety of your plant. You therefore need to run a complete functional
test and make the necessary safety checks before the final commissioning of a plant.
Also allow for any possible foreseeable errors in the tests. This prevents you from putting
persons or equipment at risk during operation.
Software tools for commissioning
SIEMENS PRONETA provides commissioning support. You can find more information on
SIEMENS PRONETA in the section Software (Page 69).
11.2 Check before powering on for the first time
Before the first power-on, check the installation and the wiring of the S7‑1500R/H redundant
system.