Commissioning
7
The following information refers to commissioning the hardware components. Siemens
provides commissioning support through its Technical Support organization.
The motor can only be commissioned when it has been installed and integrated in a
functioning system. The commissioning documentation of all the system components must
be taken into account for the commissioning.
7.1 Safety instructions for commissioning
WARNING
Risk of death and crushing as a result of permanent magnet elds
Severe injury and material damage can result if you do not take into consideration the safety
instructions relating to permanent magnet elds.
• Refer to Chapter "Danger from strong magnetic elds (Page28)".
WARNING
injury and material damage if EMC safety requirements are not observed
Risk of death, serious personal injury, and/or material damage can occur if a machine that does
not fulll the recognized EMC safety requirements is commissioned.
• Plants and machines with converter-fed low-voltage three-phase motors must fulll the
protection requirements of EMC Guideline 2014/30/EU.
• The plant engineer is responsible for ensuring that installation is carried out in an EMC-
compliant manner. Use shielded signal and power cables. Apply the EMC installation
guideline of the converter manufacturer. For Siemens converters, this is available under
document order No. 6FC5297-□AD30-0□P□.
1FW6 built-in torque motors
Operating Instructions, 09/2022, A5E52220812B AA 109