EasyManua.ls Logo

Siemens SIMOTICS DC 1GG5 User Manual

Siemens SIMOTICS DC 1GG5
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Answers for industry.
SIMOTICS DC
DC motor
Type 1GG5
Operating Instructions / Installation Instructions
Edition 02/2016

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMOTICS DC 1GG5 and is the answer not in the manual?

Siemens SIMOTICS DC 1GG5 Specifications

General IconGeneral
BrandSiemens
ModelSIMOTICS DC 1GG5
CategoryEngine
LanguageEnglish

Summary

Introduction

About these instructions

Guidance on manual usage, document format, and safety instructions.

Safety notes

Information for the nominated person in control of the electrical installation

Details responsibilities for electrical installation safety and compliance.

The five safety rules

Essential safety procedures for electrical work in a voltage-free state.

Qualified personnel

Defines requirements for personnel performing work on the machine.

Safe handling

General precautions for operating and handling the machine safely.

Description

Applications

Describes the intended uses and applications of the DC motor.

Insulation system

Details the insulation system and its suitability for environments.

Machine design

Outlines design characteristics and compliance with standards.

Preparations for use

Safety-related aspects to consider when configuring the plant

Highlights safety considerations during plant configuration.

Transport and storage

Guidelines for safe transport and storage of the machine.

Assembling

Preparations for installation

Lists essential requirements before starting installation work.

Lift the machine to where it will be installed, and position it

Procedures for safely lifting and positioning the machine.

Installing the machine

Essential steps and safety precautions for machine installation.

Electrical connection

Bringing in and routing the cables

Guides on proper cable entry and routing for safe connection.

Connecting the main circuit

Details procedures for connecting the main power circuit.

Connecting the grounding conductor

Explains how to properly connect the grounding conductor.

Connecting the auxiliary circuits

Covers connecting auxiliary circuits like sensors and heaters.

Commissioning

Preparing for commissioning

Lists checks required before commissioning the system.

Measure the insulation resistance before commissioning

Details insulation resistance measurement procedures.

Switch on

Outlines the procedure for starting up the motor.

Operation

Switching on the machine

Describes the procedure for starting the machine.

Stoppages

Measures for machine stoppages and periods of non-operation.

Faults

Provides information on identifying and resolving operational faults.

Maintenance

Inspection and maintenance

Covers routine inspections and maintenance procedures.

Main inspection

Details the procedure and timing for the main machine inspection.

Repair

Outlines procedures for repairing the machine.

Spare Parts

Ordering data

Specifies information needed for ordering spare parts.

Stator and rotor

Lists spare parts for the stator and rotor assemblies.

External fan

Lists spare parts for the external fan assembly.

Disposal

Dismantling the machine

General procedures for dismantling the machine.

Disposal of components

Sorting and recycling machine components.

Service and Support

Technical queries or additional information

Provides contact details for technical support.

Technical data and drawings

Tightening torques for screw and bolt connections

Details tightening torques for various screw and bolt connections.

Checklists

Switching on

Checklist for verifying switch-on procedures.

Commissioning

Checklist for critical commissioning steps.

Inspection at standstill

Items to inspect when the machine is not running.

Related product manuals