4. Reattach the cables. Adhere to the markings. Do not interchange the cables.
5. Re-connect the protective circuit after replacing a contactor. Refer to the circuit diagrams to
help you. You will find these in the section headed "Overview diagram, circuit diagram,
terminal diagram" in the "Power Unit Circuit Manual".
9.7.7 Replacing the current transformer
Removing the current transformer
To remove the current transformer, proceed as follows:
1. Observe the five safety rules.
2. Switch off the power supply for the current transformer.
3. If the cores do not have core end markings, mark the connecting point.
4. Disconnect the 3-pole shielded cables for the measuring signal.
5. Remove the green/yellow ground wire connected to the insulated round rod.
6. Remove the fixing screws from the insulated round rod and the transformer.
7. Remove the current transformer from the cabinet.
See also
The 5 safety rules (Page 15)
Installing the current transformer
To install the current transformer, proceed as follows:
1. Carry out the removal steps in reverse order.
2. Screw the screws into the busbars with a tightening torque of 25 Nm.
3. After installing the current transformer, check that it works properly.
Maintenance
9.7 Repairs
SINAMICS GL150 6SL38503UM114PA0Z
122 Operating Instructions Rev.201910301420 MUSTER