EasyManua.ls Logo

Siemens SINAMICS GL150 - Replacing the DC-Link Reactor

Siemens SINAMICS GL150
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.7.10 Replacing the DC-link reactor
Establishing and grounding the power connections
The power connections are made by the expansion straps. To establish and ground the power
connections, proceed as follows:
1. Clean and grease the contact surfaces immediately before screwing in the connections.
For this purpose, use the cleansing agents and greases listed in the table below.
Medium Description
Cleaning agent Ethyl alcohol and lint-free cloth
Grease Electrolube 2G or equivalent contact lubricant
2. Screw in the connections. The tightening torque of the M12 screw connections supplied is
50 Nm.
3. Ground the DC link reactor by the cabinet grounding cable.
Maintenance
9.7 Repairs
SINAMICS GL150 6SL38503UM114PA0Z
130 Operating Instructions Rev.201910301420 MUSTER

Table of Contents

Other manuals for Siemens SINAMICS GL150

Related product manuals