EasyManua.ls Logo

Siemens SINOVA - Page 153

Siemens SINOVA
220 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessories
3.10 Accessories for integration in the power distribution equipment
3WJ Air Circuit breakers
152 Operating Instructions, 12/2022, L1V30828903001-01
Installation of the shutter - Frame size II
Check if the control mechanism is properly installed.
To do so, pull out the guiding rails and snap the control mechanism into place.
Place the shutters on the levers of the control mechanism. Attach the insulation plate and
secure with the screws.

Table of Contents

Related product manuals