EasyManua.ls Logo

Siemens SINOVA - Page 38

Siemens SINOVA
220 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Description
2.1 Mechanical components
3WJ Air Circuit breakers
Operating Instructions, 12/2022, L1V30828903001-01
37
Routing of the cables from the secondary disconnect terminals
fixed-mounted
withdrawable
Note
Cable routing
Only route the cables as shown in the pictures above. Make sure to route the cables
sideways. Secure them with cable ties on withdrawable Circuit Breakers.
Note
Potential wire damage
Do not install cables in the highlighted areas of the following pictures.
fixed
-mounted
withdrawable

Table of Contents

Related product manuals