EasyManuals Logo

Siko AP10 Installation Instructions

Siko AP10
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
AP10
Transport, Storage, Maintenance and Disposal English
AP10 · Date 10.01.2020 · Art. No. 86832 · Mod. status 6/20
38
1
Screw
2
Battery unit
3
O ring
4
Housing
Fig. 11: Battery change
6.4 Faults after battery change
Data loss
Battery symbol on display is glowing in spite of new battery.
` Await updating. The battery's state-of-charge display is updated at
intervals of <10min.
` Insucient contact, repeat chapter 6.3.
` Disconnect the position indicator from the supply voltage. With repea-
ted applying of supply voltage, the battery display will be initialized
and updated. Execute calibration travel according to User manual.
7 Transport, Storage, Maintenance and Disposal
Transport and storage
Handle, transport and store position indicators with care. Pay attention to
the following points:
• Transport and / or store position indicators in the unopened original
packaging.
• Protect position indicators from harmful physical influences including
dust, heat and humidity.
• Do not damage connections through mechanical or thermal impact.
• Prior to installation inspect the position indicator for transport dam-
ages. Do not install damaged position indicators.
NOTICE

Other manuals for Siko AP10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siko AP10 and is the answer not in the manual?

Siko AP10 Specifications

General IconGeneral
BrandSiko
ModelAP10
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals