EasyManua.ls Logo

Sime UNIQA REVOLUTION - Gas Conversion Procedure; Gas Type Conversion Steps; Preliminary Operations for Conversion

Sime UNIQA REVOLUTION
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
7.6 Gas conversion
UNIQA REVOLUTION
models can be transformed from operating
with G20 (methane) to G30/G31 (LPG), by installing the “Nozzle
kit for G30/G31” code 8059250, to be ordered separately from
the boiler, , also modifying
“PAR 03”
.
m
CAUTION
The maintenance interventions described must ONLY
be carried out the professionally qualified personnel.
a
WARNING
Before carrying out any interventions described:
set the main system switch to "OFF"
close the gas valve
make sure that no hot parts inside the appliance are
touched.
OFF
Fig. 43
7.6.1 Preliminary operations
To carry out the conversion:
remove the screws (1), pull the front panel (2) forwards and
release it from the top by lifting it
1
2
Fig. 44
remove the screws (3) securing the control panel (4)
move the panel (4) upwards (a) but keeping it in the side
guides (5) to the end of travel
bring it forwards and down (b) until it is horizontal
3
a
b
5
4
Fig. 45
unscrew the screws (6) and remove the panel (7) carefully
7
6
Fig. 46

Table of Contents

Related product manuals