e. When the write operation is completed, the success or failure of the
operation for each VAC, Site or Base will be indicated in the Comms
History area.
7.6.4. 4.6.4 Enable Bases
1. On the system I/O page, in the System Monitor area, on the navigation tree,
carry out the following:
a. To enable all the bases on a system, carry out the following:
i. Right click on the VAC that you wish to enable. Menu options will be
displayed.
ii. From the menu options, select ‘Site Options’ > ‘Enable Site(s)’. The sites
enable warning message will be displayed.
b. To enable an individual base, carry out the following:
i. Right click on the Base that you wish to enable. Menu options will be
displayed.
ii. From the menu options, select ‘Base Operations’ > ‘Enable Base(s)’. The base
enable warning message will be displayed.
c. On the relevant warning message, select ‘Yes’ to continue.
d. In the System Monitor area, on the navigation tree, confirm that the
status notification that was alongside the relevant VAC, Site or
individual base has now disappeared.
e. In the Comms History area, after a short delay, confirm that the relevant
‘Completed Enabling Base’ message(s) is displayed.
Doc Number: TNM-I-E-0046 ISSUE 1.2 Page 48