2.4. DC POWER CONNECTOR 28
3 ELECTRICAL CONNECTIONS 29
3.1. GENERAL 29
3.2. REAR PANEL CONNECTORS 29
3.2.1. Tx/Rx Connections 30
3.2.2. Power Connection 30
3.2.3. Earth Point 31
3.2.4. P3 USB A Dual 31
3.2.5. P4 USB B 31
3.2.6. P5 Ethernet 31
3.2.7. S2 Serial Port 32
3.2.8. S1 Facilities Connector 32
4 WALL MOUNT INSTALLATION 34
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 34
4.1. INSTALLATION OF THE WALL MOUNT UNIT 34
4.2. ELECTRICAL CONNECTIONS 36
5 RACK MOUNT INSTALLATION PROCEDURE 37
5.1. TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 37
5.2. RACK PREPARATION 37
5.3. FITTING THE SDB680 BASE STATION 38
5.4. ELECTRICAL CONNECTIONS 38
6 CONFIGURATION OF NEW TIER II BASE STATION 39
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 39
6.1. SDB680 PREPARATION 39
6.2. SDMT INSTALLATION AND PREPARATION 40
6.3. INSTALLING THE SIMOCO IP CONFIGURATION SERVER 40
6.4. IP ADDRESS CONFIGURATION 40
6.5. CONFIGURING THE DMR BASE 41
7 CONFIGURATION OF NEW TIER III BASE STATION 43
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 43
7.1. 4.1 SOFTWARE LICENCES 43
7.2. SDB680 PREPARATION 44
7.3. SDMT INSTALLATION AND PREPARATION 44
7.4. INSTALLING THE SIMOCO IP CONFIGURATION SERVER 44
7.5. 4.5 IP ADDRESS CONFIGURATION 44
7.6. CONFIGURING THE DMR BASE 45
7.6.1. Platform and Application Software Update 45
7.6.2. Software Licence Update 47
7.6.3. Configuration Creation and Upload 47
7.6.4. 4.6.4 Enable Bases 48
8 BASE CONFIGURATION TIER II TO TIER III 49
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 49
8.1. TIER III BASE PREREQUISITES 49
8.2. SOFTWARE LICENCES 49
8.3. IP ADDRESS CONFIGURATION 50
8.4. CONFIGURING THE DMR BASE 50
Doc Number: TNM-I-E-0046 ISSUE 1.2 Page 7