EasyManua.ls Logo

Simrad 6kW - 3.10 Install the Radar Processor

Simrad 6kW
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the radar | 17
3.10 Install the radar processor
Install the radar processor in a dry location away from spray, rain, drips and condensation.
The radar processor must be located where it can be easily connected to the ship's ground, the
interconnection cable, the power cable and the radar communications cable or the network
cable. Check that these cables and the ship's ground can easily reach the radar processor
BEFORE you drill.
The radar processor dimensions are shown on the installation template. Follow the instructions
on the installation template to install the radar processor.

Table of Contents

Related product manuals