EasyManua.ls Logo

Skyjack SJ63 AJ+ - Boom Assembly

Skyjack SJ63 AJ+
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
213211AAA SJ63 AJ+
48
Section 4 – Inspections Before Operation Visual and daily maintenance inspections
4.2-9 Boom assembly
Do the inspection that follows, and make sure:
1
Load cell
▪
There are no loose or missing parts, and there
is no visible damage.
▪
All fasteners are correctly tightened.
▪
All cables are in good condition and not loose.
▪
There is no debris between the platform and
the boom adaptor.
2
Rotary actuator
▪
There are no loose or missing parts, and there
is no visible damage.
▪
All fasteners are correctly tightened.
▪
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
3
Jib
▪
There are no loose or missing parts, and there
is no visible damage.
▪
All fasteners are correctly tightened.
▪
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
4
Cable Track
▪
There are no loose or missing parts, and there
is no visible damage.
5
Cylinders
▪
Make sure the cylinders are correctly installed.
▪
Make sure there is no indication of leaks or
damage.
6
Wear pads
▪
All fasteners are correctly tightened.
▪
There are no loose or missing parts, and there
is no visible damage to the wear pads.
7
Boom
▪
There are no loose or missing parts, and there
is no visible damage.
▪
All fasteners are correctly tightened.
▪
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Hoses
▪
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
21
3 4
5
7
6
6
To order go to Discount-Equipment.com

Table of Contents