i) Fuselage (1. 8. 9. 11. 12. 14. 15. 19.) – check the following:
• Fuselage skin - Check
• Anti-collision beacon (bottom) - Check
• Fibreglass cover (over stabilizator installation points) -
Check
• Directional control system - Check
• Tail eye - Check
j) Horizontal Tail Unit (9. 10. 11. 12. 13. 14.) – check the
following:
• Clearance in horizontal stabilizer instalation points- Check
• Stabilizer and elevators - Check skin condition
• Clearance in elevator installation points - Check
• Horizontal tail unit end tip - Check
• Nuts and screws secure - Check
• Trim - Check following:
- skin condition
- correctly function
- instalation points
- p rod condition and corrected attachment
k) Vertical Tail Unit (9. 11. 12. 14.) – check the following:
• Clearance in rudder installation points - Check
• Vertical tail unit end tip - Check
• Nuts and screws secure - Check
Write the inspection results into the Logbook!