EasyManua.ls Logo

Skyleader SL 200 - Other Procedures; Procedures for Landing Gear Operation; Signaling Check before Fl Ight

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SL200 FMM 2009-10-21
67
Flight Manual SL 200 Book 1
OTHER PROCEDURES4.
Procedures for landing gear operation4.1.
The primary landing gear control on the instrument panel controls the landing gear. Before engaging the lever, it
is necessary to unlock it by drawing the locking handle to the lever, which is now free to move. The position of the
undercarriage is indicated by control lights on the conventional indicator and by the mechanical indicator of the leg
position on the console under the instrument panel.
Signaling check before fl ight4.1.1.
Check if landing gear lever is in DOWN position. When switching the master switch on, look at the landing gear
indicator. Only three greens are shinning for extended gear. When pushing the test button, all lights starts to shine.
If any control light does not shine during the test, it is necessary for the landing gear system to be inspected by
a qualifi ed expert. A check of correct signaling - siren, can only be achieved if the airplane is on stands with the
undercarriage retracted.
The check of acoustic alarm can only be carried on check stand with retracted landing gear!

Table of Contents

Related product manuals