EasyManua.ls Logo

Skyleader SL 200 - Disassembly and Assembly of Elevators

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenace Manual SL 200 Book 2
SL200 FMM 2009-10-21
96
Disassembly and assembly of elevators2.5.
Disassembly
- Disconnect the trim connector on the right elevator
- Take off the split pins on the outer attachment points of the elevator
- Unscrew the nut take out the screw on one side
- Extend the elevator out of stabilizer attachment point fi rst, and then out of the fi n carrier
- Wrap joint bearings with scotch tape to guard against dirt
- Disconnect the other elevator in the same way
Assembly
- Lightly lubricate inner elevator attachment by Cu 7439 plus; drip oil + M55 plus on joint bearings
- Insert the front attachment points of the stabilizer to the front attachment points of the fuselage
- Connect the trim cable with the connector on the right side of the elevator
- Insert the inner attachment point (bolt) of the elevator to the carrier on the fuselage
- Insert the screw, put the washer and the nut on, and tighten (5,5 Nm (4.06 lbf.ft)) and secure with new split pins
- Carry on analogically with the second half of the elevator but remember, that there is no balancing tab

Table of Contents

Related product manuals