Page 23
ERGON SERVICE • REV0
b. Cantilevered Shelves
Figure 5-16.
Removeequipmentfromshelvestobeadjusted
andloosenthegroundscrewsandthefourbolts
securingtherearoftheshelftotheshelftrack.
Avoidcompletely removing the bolts but loosen
sufciently to allow vertical travel necessary to
facilitate the adjustment.
Looseneachboltsecuringtheshelfsupportblocks
onthesideshelftracks.
Adjust the shelves in accordance with the space
requirement needs necessary to accommodate
theequipmenttobeplacedontheshelves.Once
theadjustmentiscomplete,tightenthefourbolts
rmlyandensurethattheshelfissecured.Tighten
the ground screw and verify that the equipment rail
haslessthan0.1ΩEarthresistance.
Install the equipment on the shelf ensuring that the
equipment is stable and secured as necessary.
Maketherespectivemedicalgas,electricalorA/V
and data connections as needed.
4 BOLTS
2 SUPPORT BLOCK BOLTS
GROUND SCREW
Figure 5-17. Cantilevered Shelves
CAUTION
The maximum equipment weight for
eachCantileveredshelfis70lbs.(31
kg.).Usecautiontoavoidoverloading
whenstackingmorethanonepieceof
equipment onthe shelves. Unstable
equipment may fall off the shelves
during positioning of the carrier. Hold
downstrapsmayberequired.
Removeequipmentfromshelvestobeadjusted
andloosenthefourboltsfoundontheunderside
of the shelf, along with the grounding screw. Avoid
completelyremovingtheboltsbutloosensufciently
to allow vertical travel necessary to facilitate the
adjustment.
Adjust the shelves in accordance with the space
requirement needs necessary to accommodate
theequipmenttobeplacedontheshelves.Once
theadjustmentiscomplete,tightenthefourbolts
rmlyandensurethattheshelfissecured,verify
thattheequipmentrailhaslessthan0.1ΩEarth
resistance.
Install the equipment on the shelf ensuring that the
equipment is stable and secured as necessary.
Maketherespectivemedicalgas,electricalorA/V
and data connections as needed.