EasyManua.ls Logo

SMART Board 685ix - Chapter 1: Installing the SMART Board 685 ix System; Pre-Installation Steps and Requirements; Mounting the SMART Board 685 ix System on FUWM-600 Wall Mount; Installing the Projector Mount and Bracket

SMART Board 685ix
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 1
Installing your SMART Board 685ix
premium interactive whiteboard
system (appliance-based)
IMPORTANT
Use the instructions in this guide to install your interactive whiteboard, control
module and UX60 projector on the FUWM-600 wall mount.
The instructions in your SMART Board 685 interactive whiteboard box do not
include instructions for installing the UX60 projector or control module, and
the instructions in the SMART Board 685ix and SBD685 Interactive
Whiteboard System document do not show how to mount the interactive
whiteboard or projector on the wall mount.
Refer to the FUWM-600 SE240/VE220 installation instructions included with
the wall mount, document 99-01032-20, to install the wall mount.
In this chapter
Refer to these topics for information about mounting your SMART Board 685ix
interactive whiteboard system (appliance-based) on its FUWM-600 wall mount.
Before installing the SMART Board 685ix interactive whiteboard system on
page 2
Environmental requirements on page 2
Verify the installation of the FUWM-600 wall mount and the SMART Hub
SE240/VE220 on page 2
Mounting your SMART Board 685ix interactive whiteboard system on a
FUWM-600 wall mount on page 3
Tools required on page 3
Installing the projector mount and wall mount bracket on page 4
Installing the SMART Hub SE240/SE220’s power and USB cables on page 6
Installing the projector cables on page 7

Table of Contents

Other manuals for SMART Board 685ix

Related product manuals