EasyManuals Logo

SMC Networks SMCGS24C-Smart User Manual

SMC Networks SMCGS24C-Smart
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
I
NSTALLING
THE
S
WITCH
3-4
Rack Mounting
Before rack mounting the switch, pay particular attention to the following
factors:
Temperature: Since the temperature within a rack assembly may be
higher than the ambient room temperature, check that the
rack-environment temperature is within the specified operating
temperature range (see page C-2).
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly
is not overloaded.
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than
direct connections to the mains.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks SMCGS24C-Smart and is the answer not in the manual?

SMC Networks SMCGS24C-Smart Specifications

General IconGeneral
BrandSMC Networks
ModelSMCGS24C-Smart
CategorySwitch
LanguageEnglish

Related product manuals