EasyManua.ls Logo

SMS SenTRI ONE - EN54 Information; Optional Functions with Requirements of this European Standard; System Wiring; Cable Separation

SMS SenTRI ONE
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN54 information
Optional functions with requirements of this European standard
The Control panel complies with the requirements of EN54 : Part 2 : 1997. In addition to the basic requirements of the standard the
panel conforms to the following optional clauses:
Clause Description
7.8 Output to fire alarm devices
7.11 Delays to action outputs
8.3 Fault signals from point
10 Test condition
System wiring
"
If instructed, the installer may need to terminate as well as connect the cables to the appropriate terminal blocks.
Cable separation
Where the outgoing and return cables of a loop circuit covers more than the equivalent of one zone they must not run together, for
example, either close to the Control Panel or in a service duct. There should be as much physical separation as possible between
the cables and the mechanical protection of the cable should be to a particularly high standard. This is to minimise the risk of
accidental damage to both cables.
Lightning protection
Where a loop cable is mounted to an external wall or between two buildings then consideration should be given to the use of
lightning protection devices.
Installation instructions
6
0XXxx
1
1
2 2
Zone circuit
Sounder circuit
3
230V ac
Other loop devices
3
1
2
Loop voltage
surge protection
Mains 230Vac
voltage surge
protection
Input Output lin
e
voltage surge
protection
There must be a good earth
connection to the voltage surge
protection device
Interface
Unit
SenTRI ONE
Control Panel
042bc/14

Table of Contents