EasyManua.ls Logo

Snapper LE317 - Operation

Snapper LE317
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section
II
-
MACHINE
OPERATION
6.
Electric
Start
(If
So
Equipped)
-
(Tecumseh
&
Decal)
Connect
Power
Cord
to
Starter
Switch
Box
on
panel,
then
plug
the
other
end
into
a
120
volt
AC
receptacle.
Push
Starter
Button
in
until
engine
starts
-
do
not
hold
button
for
more
than
twenty
seconds
to
avoid
damaging
Starter
Motor.
After
engine
starts,
disconnect
Power
Cord
from
the
AC
receptacle
first,
then
unplug
from
the
switch
box
on
the
Snow
Thrower.
B.
A
fter
the
engine
has
started,
move
the
Choke
Lever
to
the
left
slowly.
If
the
engine
falters,
it
may
become
necessary
to
move
the
Choke
Lever
back
to
the
right
slightly.
When
the
engine
has
smoothed
out,
move
the
Choke
Lever
fully
to
the
left.
2.8
OPERATION
(ALSO
SEE
SECTION
III
SNOWTHROWING
TECHNIQUES)
CAUTION
A
OBSERVE
SURROUNDINGS
FOR
ANY
VEHICULAR
TRAFFIC
OR
OBSTACLES.
TAKE
NOTE
OF
WIND
DIRECTION
AND
CONDITION
OF
SNOW
(LIGHT
FLUFFY,
MODERATE,
HEAVY
WET).
OPERATE
SNOW
THROWER
ONLY
IF
CONDITIONS
ARE
SAFE.
A.
Rotate
Chute
to
the
direction
in
which
you
would
like
to
throw
the
snow.
B.
Adjust
Discharge
Deflector
upward
or
downward
to
achieve
the
desired
distance.
C.
Move
back
to
the
Operator
Position
and
move
the
unit
to
the
area
to
be
cleared.
D.
Move
the
Auger
Clutch
Control
down
to
the
Handle
and
start
the
Auger
rotating.
Lift
the
Upper
Handle
slightly
tilting
forward
onto
Auger
flighting
which
allows
the
unit
to
pull
itself
into
the
snow.
You
will
have
to
adjust
the
rate
at
which
you
move
through
the
snow
to
match
the
snow
condition
and
unit
performance.
During
extreme
wet
heavy
snows,
it
may
be
necessary
to
remove
less
than
a
full
width.
E.
At
some
point,
you
will
need
to
change
directions
when
clearing
snow.
Always
turn
the
Discharge
Chute
to
direct
the
snow
onto
uncleared
areas
(preferably
downwind)
and
adjust
the
deflector
accordingly
for
conditions.
F.
When
you
have
completed
throwing
snow,
move
the
unit
to
a
cleared
area.
Brush
excess
snow
off
unit.
Let
unit
run
with
Auger
rotating
for
a
period
of
5
minutes.
Turn
unit
“OFF”
and
return
to
storage.

Related product manuals