EasyManua.ls Logo

socomec COUNTIS E23 - SETUP 2 Menu Overview

socomec COUNTIS E23
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
COUNTIS E23/E24 - Ref.: 542 102 A
COUNTIS E23/E24 MODBUS
12. MID compliance
The COUNTIS E24 meter complies with the MID directive for connection of three-phase networks (see "5.4.
Connections", page 6).
Afterconnectingtheproduct,checkthattheterminalcoversarecorrectlyttedandsecuredbythe2plasticseals
supplied with the product (see "5.5. Sealable covers", page 6). If the terminal covers must be removed, ensure
that the same seal part numbers are used (ref. 4850 304U).
The information given via the communication bus is only sent by way of information and has no legal value.
TheassignedoperatingconditionsguaranteeingMIDcomplianceareavailableinthetechnicalspecicationstables.
The MID declaration of conformity for the COUNTIS E24 is available
online at: www.socomec.com/en/countis-e2x

Other manuals for socomec COUNTIS E23

Related product manuals