SOFAR 15~24KTLX-G3 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd.
R type terminal, Insulating sleeve,
RNBS14-6 (8awg). terminal shall not be exposed.
Figure 4-9 AC cable connection instruction diagram (1)
Step 3: After assembling the PG waterproof connector, connect the cable to the AC
terminal block L1, L2, L3, N, PE contacts, and fasten them (4~5 N · m). Tighten the
lock nut of PG terminal clockwise (7~8 N · m).
Figure 4-10 AC cable connection instruction diagram (2)