EasyManua.ls Logo

Sofarsolar SOFAR 7KTLM-G3 - Moving the SOFAR 7 K~10.5 KTLM-G3

Sofarsolar SOFAR 7KTLM-G3
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SOFAR 7K~10.5KTLM-G3 User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 17 -
3.5. Moving the SOFAR 7K~10.5KTLM-G3
This topic describes how to move the to the installation position Horizontally
SOFAR 7K~10.5KTLM-G3.
Step 1 Open the packaging, insert hands into the slots on both sides of the
inverter and hold the handles, as shown in Figure 3-3 and Figure 3-4.
Figure 3-3 Moving the inverter (1)

Related product manuals