Figure 25: Connecting the Protective Earth (PE) wire
NOTE
Ground the conduit nut if required by regulation.
To connect AC wires to the Synergy Manager:
1.
Verify that the main AC circuit breaker is in OFF position at the circuit breakers panel.
2.
Remove the upper cover of the AC terminal block.
Figure 26: Upper cover of AC terminal block
3.
Route the AC wires through the AC conduit.
4.
Fasten the conduit nut inside the Synergy Manager.
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx
58 Connecting Ground and AC Wires to the Synergy Manager