Chapter 6: Activating, Commissioning and
Configuring the System
After the solar system is installed, it is important to activate and commission the solar
system. Activation and commission of the system is performed using the inverter
SetApp mobile application.
The solar system can be activated and commissioned in the following stages of system
stage:
On-grid: The inverter is connected to a utility grid
Pre-commissioning (Off-grid): The inverter is not connected to a grid to enable:
-Early validation and fault detection of system components, such as inverters, Power
Optimizer, PV modules before activation
- Ensure system integrity before connecting to the grid
During the activation and commissioning, the inverter discovers and communicates
with all connected components in the solar system, such as: optimizers, peripheral
communication devices and other linked inverters. When commissioning is performed,
the user is required to set the grid parameters and backup Voltage information (if used).
Before starting the activation and commissioning, verify the all the communication
hardware is properly connect. For communication options, refer to:
Setting Up
Communication with the Monitoring Platform
on page 61.
Before arriving at the site, download SolarEdge SetApp application to your mobile
device from Apple App Store or Google Play .
Before activation and commissioning, download the SetApp application from:
For downloading SetApp, Internet connection, one-time registration and logging are
required. No registration is required for using the SetApp.
Chapter 6: Activating, Commissioning and Configuring the System75
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE100K and is the answer not in the manual?

SolarEdge SE100K Specifications

General IconGeneral
Max. Efficiency98.8%
Transformer-lessYes
Protection RatingIP65
Frequency50/60 Hz
AC Output Power100 kW
Rated AC Power100, 000 W
Maximum DC Power135000 W
AC Voltage400 V
Max. Input Voltage1000Vdc
Operating Temperature Range-25°C to 60°C