EasyManuals Logo

SolarEdge SE100K User Manual

SolarEdge SE100K
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #75 background imageLoading...
Page #75 background image
Verifying the Connection
After connecting and configuring a communication option, perform the following steps
to check that the connection to the Monitoring platform has been successfully
established.
1.
If the Synergy Manager cover is not closed, close it: Attach the cover and secure it by
tightening the screws of 2.6 lb.*ft. For proper sealing, first tighten the corner screws
and then the two central screws.
2. Commission the inverter as describe in "Activating, Commissioning and
Configuring the System" on page75.
3. Access SetApp and selectStatus from the Configuring screen.
4. In the Summary section, under Server Comm., make sure S_OK is displayed
together with the selected communication option.
5.
Scroll down to the Communication section and check that the communication
options are as required.
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx
74 Verifying the Connection

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE100K and is the answer not in the manual?

SolarEdge SE100K Specifications

General IconGeneral
Max. Efficiency98.8%
Transformer-lessYes
Protection RatingIP65
Frequency50/60 Hz
AC Output Power100 kW
Rated AC Power100, 000 W
Maximum DC Power135000 W
AC Voltage400 V
Max. Input Voltage1000Vdc
Operating Temperature Range-25°C to 60°C

Related product manuals