Connecting PV Modules to the Synergy Manager 48
Connection Methods 50
Connecting PV Strings to the Synergy Manager 52
Connecting PV Arrays to the Synergy Manager 54
Connecting Ground and AC Wires to the Synergy Manager 56
Chapter 5: Setting Up Communication with the Monitoring Platform 61
Communication Options 61
Communication Connectors 62
Creating an Local Area Network (LAN) Connection 65
Creating an RS485 Bus Connection 70
RS485 Bus Configuration 73
Verifying the Connection 74
Chapter 6: Activating, Commissioning and Configuring the System 75
On-grid Commissioning of the inverter 76
Step 3: Verifying Proper Activation and Commissioning 79
Pre-commissioning (Off-Grid) 80
Reporting and Monitoring Installation Data 82
Signaling Options 83
Appendix A: Errors and Troubleshooting 85
Identifying Errors 85
Power Optimizer Troubleshooting 86
Troubleshooting Communication 88
Isolation Fault 89
Appendix B: Maintenance 90
Routine Maintenance of the Inverter 90
Monitoring the Solar System Performance 93
Appendix C: Adding Optional Components 95
AC Surge Protection Device (SPD) 95
DC Surge Protection Device (SPD) 95
Cellular Plug-in 95
Appendix D: Mechanical Specifications 97
Appendix E: Interconnection Standards 99
Performance Categories and Interconnection Standards 99
Response to Abnormal Voltages and Frequencies 99
Enter Service Settings 100
Grid Support Functions 100
Appendix F: Immunity Standards
102
Revision History5
Three Phase Inverters with Synergy Technology PN: SExxK-xxxxIxxxx