29
5 Equipment Installation
Secure the assembled bracket to the wall with Tapping screws (× 2) and
Washer (× 2), and tighten them (Torque: 4 N·m);
Secure the assembled bracket on the battery module with M4x14
Phillips-head screws (× 2), and tighten them (Torque: 0.9 to 1.1 N·m);
Tighten the M6 Flange nuts (× 2) (please refer to the Step 6) (Torque: 5
N·m).
Remove
dust cover
Torque: 4 N·m
Torque: 0.9-1.1 N·m
Torque: 5 N·m
Step 8: Place BMS, and tighten M4x14 Phillips-head screws (× 2) on both sides
(Torque: 0.9 to 1.1 N·m)
Torque: 0.9-1.1 N·m
1 2