47
9 Decommissioning
9 Decommissioning
9.1 Dismantling Battery
Shutting down battery unit:
■
Disconnect the cables between BMS and inverter;
■
Disconnect the series wiring terminal on the battery;
■
Disconnect the cables.
9.2 Packing
Pack the BMS and battery module in the original packaging.
If the original packaging is no longer available, use an equivalent carton or box
that meets the following requirements:
■
Suitable for loads over 70.00 kg;
■
Properly closed and sealed.