However, this level of safety can be achieved in operational practice only when all measures required
for this purpose have been put in place. The onus of planning the required measures and checking
their implementation lies with the operator of the device.
Prior to commissioning, the device must be fixed to a
suitable table with screws.
The user of the punch device must ensure that this User Manual is accessible to all persons using the
device, and must make sure that they have read and understood the same. Only then may one put the
punch into operation.
The User Manual must always be available at the place where the fitting punch has been installed.
The responsibilities pertaining to the fitting punch must be clearly determined and complied with.
Inadequate competencies could endanger the safety of the users.
6.4 Requirements concerning personnel
All tasks such as, for example, assembly, installation, commissioning, operation, troubleshooting,
maintenance or repair may be carried out only by authorized technical personnel.
The technical personnel must have the required competence to carry out the tasks safely, and must
be adequately trained on the fitting punch, particularly with respect to the hazards and safety
measures with respect to working safely with the fitting punch.
7 Technical Data
Operating pressure
5 – 8 bar