Language | English |
Checks product suitability, material, pressure, and temperature limits for system integration.
Ensures safe access, working platforms, and adequate lighting for maintenance operations.
Assesses pipeline hazards, surrounding environment, system effects, pressure, and temperature safety.
Procedures for isolating pressure systems and managing temperature risks during work.
Overview of the BC3150 blowdown controller for steam boilers and its function.
Details the LCD display and five-button keypad for operation and control functions.
Explains the function of each button for menu navigation, parameter adjustment, and operation.
Explains the product's function to control TDS/conductivity of water in steam boilers.
Details acceptable signals from conductivity probes and temperature sensors.
Describes continuous, purge, pulsed, and 4-20mA outputs and their operational modes.
Guidance on installing the product in suitable environments, avoiding heat and interference.
Instructions for mounting the product on a 35 mm DIN rail using the provided clip and screws.
Steps for fitting the unit to a chassis plate using screws, nuts, and washers.
Procedures for installing the product in a panel cutout, including bezel and screw details.
Precautions for safe electrical installation, including overcurrent protection and wiring standards compliance.
Guidance on connecting the mains supply, including fuses and disconnection devices.
Information on creating earth current loops and using functional earth terminals for EMC.
Details on probe cable types, maximum lengths, and connection diagrams for sensors.
Overview of the commissioning process via the front panel, including warnings and timeout procedures.
Minimum commissioning steps for basic operation, including Set Point, Alarm, and Calibration.
Detailed menu structure and parameters for comprehensive system commissioning.
How controllers communicate via infrared link for parameter passing between adjacent units.
Guidelines for cleaning the product using appropriate materials and avoiding damage.
Importance of testing and inspecting TDS controls and alarms according to HSE guidance.
Routine checks including water sampling, calibration verification, and valve operation.
Procedures for probe removal, cleaning, and inspection of valves and fittings.
Guidance on identifying and correcting faults, likely occurring during installation and commissioning.
Symptoms and actions for common issues like display not illuminating or flashing on/off.
Explains error messages like "Power out", "Setup menu time out", and "Alarm 1".
How to check the probe condition via probe factor (PF) and interpret results.
Information on obtaining technical support from Spirax Sarco representatives and website.
Instructions and required information for returning equipment for repair or warranty.
Details mains voltage range and power consumption of the BC3150 product.
Specifies operating conditions, altitude, temperature, humidity, and enclosure ratings.
Lists and explains the product's data registers for parameters, identification, and status.
Visual representation of the normal run mode display and menu navigation flow for the controller.