EasyManua.ls Logo

SPT SPT299 - Page 116

SPT SPT299
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SPT-299CZ-02
113
High Altitude Hoisting
1. Put the machine into the car and it is in the state of transportation.
2. Pass the wire rope through the eyebolts on the top of the machine outriggers (A).
Lifting by forklift
1. Put the machine into the car and it is in the state of transportation.
2. Choose a three-ton forklift and insert the forklift into the forklift hole of the machine.
A

Table of Contents