EasyManua.ls Logo

SPXFLOW C Series - Page 43

SPXFLOW C Series
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Waukesha Cherry-Burrell
®
Brand C-Series Pump
01/2019 95-03008-IEC Page 43
4. Install the lubricated seal O-ring into the seal.
5. Seal O-ring shown installed.
6. Install the seal, cup, and spring onto the stub shaft. Line up
the groove on the cup with the pin on the stub shaft.
7. Push the seal onto the stub shaft until the pin on the stub
shaft enters the groove on the cup.
Figure 96 - Install O-ring
Figure 97 - Seal O-ring installed
Figure 98 - Line up groove and pin
Figure 99 - Push seal on stub shaft

Related product manuals