7 Inspection and maintenance
01.2019 43
7.12.2 Assemble new bottom hook block
1. Assemble the new bottom hook block in the reverse sequence to disassembly.
2. Tighten the screws (1) to the prescribed tightening torque, for torque see chapter
"Tightening torque for bolted connections".
7.13 Replacing two-fall bottom hook block
1. Unscrew chain anchorage.
2. Run chain into new bottom hook block.
3. Refit chain anchorage.
4. Grease moving parts.
5. Run through hook path, check that chain is not twisted.
7.14 Replacing return sheave