EasyManua.ls Logo

STONEX R180 - Preparation & Instrument Setting up; Battery and Charger

STONEX R180
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Stonex R180 – User Manual 10
3. Preparation & instrument setting up
3.1. Battery and Charger
Installing / Replacing Battery
R180 carrying case contains two rechargable Li-ion (Li-64 model) batteries. Here below the description
of their technical features.
Follow the procedure below to mount/remove the battery:
Mount the Battery
a. Insert the battery in the battery box.
b. Insert the battery box with the battery
inserted, in the battery compartment
(Note. When inserting the battery, be
careful to put the electrodes on top as
visible in the picture on the right).
Battery Voltage/Capacity
14.4 v / 6400 mAh
Operating Time
6 hours
Battery Charger
4 hours

Related product manuals