EasyManua.ls Logo

STONEX R2 PLUS User Manual

STONEX R2 PLUS
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
User Manual
R2 PLUS
Total Station
www.stonexpositioning.com

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the STONEX R2 PLUS and is the answer not in the manual?

STONEX R2 PLUS Specifications

General IconGeneral
Angle accuracy2"
Laser PlummetYes
Laser ClassClass 3R
Laser Wavelength635 nm
Battery TypeLi-ion
Operating Temperature-20°C to +50°C
Weight5.2 kg
Distance measurement with prism5000 m
External memorySD card
Operating SystemWindows CE
Measurement RangeUp to 5000 m with prism
Accuracy2 mm + 2 ppm

Summary

Precautions for Safety

Note

General notes for safe operation and instrument care.

Definition of Indication

Explains warning and caution symbols used in the manual.

Safety Standards for Laser (R1 series)

Details safety standards for laser usage according to IEC.

About User

Defines user requirements and necessary protective equipment.

Exceptions from Responsibility

Outlines manufacturer's limitations of liability for product misuse.

Preparation before Measurement

About Battery

Information on battery power, symbols, replacement, and charging.

Setting up the Instrument

Step-by-step guide to setting up the instrument on a tripod.

Centering and Levelling-Up

Instructions for centering and leveling using circular level.

Accurate Levelling-Up with Electronic Level on screen

How to use the electronic level for accurate leveling.

Basic Functions

Nomenclature

Identifies and labels the parts of the instrument.

Basic Key Operation

Explains the function of various keys on the instrument keypad.

Display

Describes the content and layout of the instrument's LCD display.

Mode Diagram

Illustrates the menu structure and navigation flow of the instrument.

Power On/Off

Procedures for turning the instrument on and off.

How to Input Number and Alphabet

Guide for inputting alphanumeric characters and numbers.

How to Configure

Instructions for configuring instrument settings like backlight and contrast.

How to Set Parameters

How to set various measurement and instrument parameters.

Angle Measurement

Measure a Horizontal Angle of Two Points

Steps to measure the horizontal angle between two sighted points.

Set the Horizontal Angle to a Required Value

How to set a specific horizontal angle value on the instrument.

Distance Measurement

Coordinate Measurement

Input the Occupied Point Data

Guide to inputting occupied point coordinates and related data.

Azimuth Setting

How to set the backsight azimuth for orientation.

3D Coordinate Measurement

Process for measuring 3D coordinates of a target.

Stake out Measurement

Distance Stake out

How to stake out a point based on distance and direction.

Coordinates Stake out Measurement

How to stake out a point using its coordinates.

REM Stake out Measurement

Performing stake out using Remote Elevation Measurement.

Area

Area Calculation by Measured Data

Calculating area using measured point data.

Area Calculation by Reading Existed Coordinates

Calculating area using pre-existing coordinate data.

Offset Measurement

Single-distance Offset Measurement

Finding a point using a single distance offset.

Angle Offset Measurement

Finding a point using an angle offset.

Dual-Distance Offset Measurement

Finding a point using two distance offsets.

MLM

Measuring Distance between Two or More Points

Measuring distances between multiple points using MLM.

Change the Starting Point

How to change the starting point for MLM measurements.

REM

Resection

Coordinate Resection

Determining station coordinates using known points.

Elevation Resection

Determining station elevation using known points.

Resection Calculation Process

Explains the steps involved in the resection calculation process.

Precautions When Performing Resection

Guidelines and precautions for performing resection accurately.

Point Projection

Define Baseline

How to define a baseline for point projection.

Point Projection

Projecting points onto a defined baseline.

Stake out Line

Define Baseline

Defining a baseline for stake out line operations.

Stake Out Line-Point

Staking out a point relative to a baseline.

Stake out Line/Line

Staking out a line relative to a baseline.

Traverse Surveying

Save Coordinate

How to save coordinates during traverse surveying.

Read Coordinate

How to read saved coordinates for traverse.

Inverse

Polar Coordinates Calculation

Repetition Angle Measurement

Arc Staking Out Measurement

Two Point Arc Staking Out

Staking out an arc defined by two points and radius.

Three Point Arc Staking Out

Staking out an arc defined by three points.

Road Staking Out Measurement

Input the Start Station

Inputting the starting station and coordinate for road design.

Input Road Horizontal Elements

Inputting line, curve, and spiral elements for road horizontal design.

Input Road Vertical Elements

Inputting station, height, and length for vertical road elements.

Road Calculation

Calculating staking points based on road design parameters.

Road Staking Out Data View

Viewing the staking station data after calculation.

Road Stake Out

Executing the road stake out based on calculated points.

Road File Management

Managing road files, including selecting, renaming, and deleting.

Record

Record Occupied Data

Recording occupied station data, including coordinates and instrument details.

Collect Angle Data

Collecting angle measurements and related data.

Distance & Coordinate Data

Recording distance and coordinate measurements.

Record Note

Recording textual notes related to measurements.

View Data

Viewing previously recorded data entries.

Select job

Selecting the active job for data recording and management.

JOB Management

Storage Media Select

Selecting internal memory or SD card for data storage.

Select a JOB

Choosing the active job for data operations.

Rename a JOB

Renaming existing jobs for better organization.

Delete a JOB

Deleting unwanted jobs and their associated data.

Output JOB Data

Transferring job data to a PC via serial port.

File Copy

Copying jobs between internal memory and SD card.

Connect PC via USB port

Connecting the instrument to a PC using a USB port for data transfer.

Known Data Management

Input Known Point Coordinate by Keys

Inputting known point coordinates manually via the keypad.

Input Known Point Coordinate via RS-232C

Inputting known point coordinates via RS-232C connection to a PC.

Delete known point coordinate

Deleting known point coordinates from memory.

View known points data

Viewing stored known point coordinate data.

Clear all known points’ data

Clearing all known point data from the active job.

Code Management

Edit Code list

Editing the list of codes for data annotation.

Clear all Codes

Clearing all defined codes from memory.

Warning and Error Messages

Check and Adjustment

The Instrument Constant

Checking and adjusting the instrument constant for distance measurements.

Tubular Level

Checking and adjusting the tubular level for precise leveling.

Circular Level

Checking and adjusting the circular level for leveling.

The Optical Sight

Checking and adjusting the optical sight.

Optical Plummet (optional)

Checking and adjusting the optical plummet.

Laser Plummet

Checking and adjusting the laser plummet.

Vertical Cross-hair on Telescope

Checking and adjusting the vertical cross-hair.

Horizontal Collimation Error C

Checking and correcting horizontal collimation error.

Tilt Sensor

Checking and cancelling tilt zero point error.

Vertical Index Error

Checking and adjusting the vertical index error.

EDM Optical Axis and the Telescope Sighting Axis Error

Checking EDM optical axis and telescope sighting axis error.

Technical Data

Accessories

Appendix I: Atmospheric correction formula and chart (Just for reference)

Appendix II:Correction for refraction and earth curvature

Appendix III: Connect the R2 PLUS series with PDA

Appendix IV Connect the R2 PLUS series and PDA with Bluetooth

Appendix V: STANDARD LIMITED WARRANTY

Appendix VI: FCC Statements

Appendix VII: Environmental recycling

Related product manuals