Assembly/Second Floor (continued)
'
~
*
Align
top
of
swing
beam
suppo
rt (outside) (W16) with
top
of
upper
wall (P7) and attach with hex
bolts
(F 18
),
l
ock
washers (F2), flat washers (F3), and T-nuts (F4) in
pre-drilled
ho
les.
Note: Make sure swing beam
support
is level.
From inside
of
l
ett
side
upper
wa
ll, align swing
beam
support
Qn
side) between
lett
pos
ts (W1,
W4
)
with
top
of
upper
wa
ll , making sure i t Is
le
vel.
59
Align
ho
les in
SB
angle
brackets (M
3)
with holes
on
underside o f swing beam
support
~nside)
(W15)
ma
ki
ng
sure
ends
of
support
are flush with end o f bracket.
Attach brackets to support with pan head
screws
(
F11
).
Secu
re
pre-assembled swing support
beam
~nside)
to
l
ett
posts (W1,
W4
)
with
pan head screws (
F1
1).